Areas of work
- Master plans and long-term planning
- Capacity models and equipment requirements
- Concept design and functional layout
- Maritime, landside and multimodal connectivity
- Phased development and investment sequencing
DUAGA prepares master plans and planning studies that connect demand, capacity, functional layout, infrastructure, equipment, access and investment sequencing. The analysis covers new projects, expansions and the modernization of existing assets.
Master plans, capacity, functional layout, connectivity and investment phasing.
Long-term planning for terminals, authorities and logistics developments through capacity analysis, infrastructure configuration, connectivity and investment sequencing.
Assessment of Tuvalu's connectivity needs, with emphasis on maritime infrastructure and investment prioritization.
2026 · Tuvalu
Formulation of a master plan for a greenfield multipurpose terminal in Colombia, integrating demand, functional configuration, infrastructure, connectivity, regulation and financial viability.
2025 to 2026 · Colombia
Formulation of a ten-year roadmap for the infrastructure, governance, operations and service quality of a port authority in the British Virgin Islands.
2025 · British Virgin Islands
3D models, rendered designs and capacity modeling for a multipurpose terminal for containers, liquids and bulk in Trinidad and Tobago.
2017 · Trinidad and Tobago
Conceptual designs for RTG and ASC configurations, capacity models, transport modeling and logistics analysis for a new container port in Canada.
2017 · Canada
Review of the master plan of a port terminal in Colombia, with a rail logistics study and a monitoring plan for the expansion works.
2015 to 2016 · Colombia